Qingdao Ruly Steel Engineering Co.,Ltd

Attitude is everything

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Prefabricated Steel Frame Buildings /

Galvanized Alkyd Painting Q345 Prefab Steel Warehouse

Galvanized Alkyd Painting Q345 Prefab Steel Warehouse

Ask Latest Price
Brand Name :Ruly Steel
Model Number :Ruly0231
Certification :SGS, ,ISO, BV
Place of Origin :China
MOQ :300 Square Meter
Payment Terms :L/C, T/T, Western Union
Supply Ability :20000 Square Meter Per Month
Delivery Time :30 Days
Packaging Details :As request
Application :Prefabricated Steel Structure Factory Buildings
Usage :Steel Structure Workshop, Metal Warehouse, Factory Buildings, Garment Factory,
Type :Prefabricated Steel Frame Buildings
Service life :50 Years
Surface treatment :Painting or Hot-dip Galvanize
Wall and Roof :Steel cladding
Columns and Beam :H Section Column&Beam
Installation :Engineer guidance on site
Contact Now

Add to Cart

Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
View Product Description

Prefabricated Steel Structure Factory Buildings Design Fabrication And Construction

Project description:

This is a Prefabricated Steel Structure Factory Buildings that is built as a engineering construction machine production factory. We are the EPC contractor for this project.

Prefabricated steel structure building is a metal structure fabricated with steel for the internal support and for exterior cladding, as opposed to steel framed buildings which generally use other materials for floors, walls, and external envelope. Steel buildings are used for a variety of purposes including storage, work spaces and living accommodation. They are classified into specific types depending on how they are used. The advantages of prefabricated steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout,etc.

Main parts of the steel structures and technical parameters:

Main Steel Frame System
Main structure H section steel Q345, alkyd painting, two primary painting, two finish painting.
Roof purlin XZ160*60*20*2.5, galvanized
Wall purlin XZ160*60*20*2.5, galvanized
Intensive bolt Grade 10.9
Turn buckle bolt M20+2, steel Q235, processing
Anchor bolt M24, steel Q235, processing
Ordinary bolt Galvanized bolt M20
Ordinary bolt Galvanized bolt M12
Brace nut Galvanized bolt M12
Bracing System
Cross brace Φ20 round steel bar Q235, process and painted (alkyd painting)
Angle brace L50*5 angle steel Q235, process and painted (alkyd painting)
Column bracing Φ25 round steel bar Q235, process and painted (alkyd painting)
Tie bar Φ127*3 steel pipe Q235, process and painted (alkyd painting)
Batter brace Φ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting)
Wall & Roof System
Roof panel Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Wall panel Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Edge cover 0.5mm color plate, angle Alu.
Fittings & accessories Nails, glue etc.
Unpowered ventilator Diameter Φ600, stainless steel
Sky lighting band 1.2mm FRP, double layer
Sliding door sandwich panel door
Roof drainage system
Gutter 0.5mm color steel plate
Rainspout pipes Φ110 PVC pipe

Galvanized Alkyd Painting Q345 Prefab Steel Warehouse

Our Steel Structure Production Plant:

Galvanized Alkyd Painting Q345 Prefab Steel Warehouse

FAQ:

Items Questions Answers
1 Are you manufacture factory or trading company? We are manufacture factory. Welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will get best and most competitive price after visiting us.
2 Is your price competitive compared with other companies? Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3 Can you send engineers or whole team to install my project? We will give detailed installation drawings for free for each project before installation. We can send engineers to guide installation on site or a construction team to install directly.
4 Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design proposal drawing, shop drawing, 3D Tekla model, construction/installation drawing to you.
5 What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after receiving deposit.
6. How to pack and transport: All the structure components, panels,bolts and sort of accessories will be well packed with standard package suitable ocean transportation and loaded into 40’HQ.
Why did you choose us?

Many customers have visited our factory for the long term cooperation."Quality firstly,Customer firstly" is our company principle.We obtain sound reputation because of our good quality and service. Meanwhile,We pay attention to the team work and value win-win cooperation, which would guide us much further.

  1. Low cost---Professional design, less construction time; saving raw materials.
  2. Environmental protection---specialized cladding materials guarantee excellent acoustic and insulation performance; no pollution ;Raw material can be recycled
  3. Comfortable and aesthetic---higher using areas and bigger building bays afford us wider viewpoints; distinctive and elegant profiles.
China Galvanized Alkyd Painting Q345 Prefab Steel Warehouse for sale

Galvanized Alkyd Painting Q345 Prefab Steel Warehouse

Inquiry Cart 0